propecia increases testosterone

Project Management

 

ComTech provides a complete turnkey solution. Weeks prior to installation, our staff works diligently to prepare for a successful installation. 

This includes ordering phone lines, installing structured cabling, pre-programming, installation and system configuration.

We take responsibility to order the phone lines and SIP lines to provide a redundant solution. Keeping all of the communication under one roof greatly reduces potential issues.

Structured cabling is building or campus telecommunications cabling infrastructure that consists of a number of standardized smaller elements (hence structured) called subsystems.

Structured cabling falls into six subsystems:

  • Entrance Facilities are where the building interfaces with the outside world.
  • Equipment Rooms host equipment which serve the users inside the building.
  • Telecommunications Rooms house telecommunication equipment which connect the backbone and the horizontal cabling subsystems.
  • Backbone Cabling connect between the entrance facilities, equipment rooms and telecommunications rooms.
  • Horizontal Cabling connect telecommunications rooms to individual outlets on the floor.
  • Work-Area Components connect end-user equipment to outlets of the horizontal cabling system.

 

Configuration

Pre-programming is a huge time saver for the onsite technician. This is done at headquarters prior to deployment. When the onsite technician completes the installation, final configuration can be done quickly.